
Unsound floor layer removed
The deteriorated floor layer and old filler are removed back to sound concrete, opening the slab-to-façade junction for repair.
Complete balcony renovation
Complete renovation for apartment associations: we repair concrete and reinforcement, seal joints, and create multi-layer protection against moisture and corrosion.
COMPLETE RENOVATION. A CLEAR PLAN. CONSIDERED PROTECTION.
Each element has a specific role: the substrate carries the load, the bonding layer connects, the fall directs water and the elastic finish protects the surface.
The load-bearing structure is opened, cleaned and assessed before new layers are installed.
A two-component epoxy adhesive connects the existing concrete with the new repair and drainage-fall layer.
A cement-based layer reinstates the substrate and creates the required fall toward drainage.
A two-component epoxy primer prepares the cured mineral substrate for the elastic coating.
A continuous, seamless elastic layer forms the balcony floor's protective surface.
System-compatible decorative flakes are broadcast into the fresh coating to create the surface texture and final appearance.
Exact materials and thicknesses are selected according to substrate condition, moisture, service load and the approved project specification.
Worn coatings, cracks and open junctions allow moisture into the structure.
The deteriorated floor layer is removed and the slab-to-façade junction is cleaned back to load-bearing concrete. Exposed rusty reinforcement reveals how water can reach the building structure.
Rust, unsound material and dust are removed, exposed reinforcement is cleaned and assessed, and visibly decayed supplementary timber is dismantled.
The slab-to-façade junction, cracks and gaps are filled with an exterior-grade elastic hybrid sealant that accommodates moisture and temperature-related movement.
Cleaned reinforcement receives a blue one-component cement-polymer passivating anticorrosion coating compliant with EN 1504-7 and promoting repair-mortar adhesion. Railing fixings receive a separately specified protection system based on the metal condition.
An epoxy bonding bridge connects the existing concrete to an exterior-grade EN 1504-3 class R4 repair and casting mortar used to restore the surface and form the drainage fall.
Mineral quartz broadcast, an elastic UV-stable polyurethane coating, decorative polymer flakes and a transparent protective topcoat form one seamless system.
The concrete substrate, epoxy bonding bridge, R4 repair layer, epoxy primer with quartz broadcast, elastic polyurethane coating and a decorative finish sealed by a transparent topcoat work as one complete system.
We clean the work area, complete the slab-junction seals with an elastic hybrid sealant, inspect the finished surface and provide care guidance. The final solution is confirmed against the building's actual condition.
Our working standard
We close the paths water uses to enter, helping keep damp, cold and mould from returning.
The video shows an actual balcony-renovation process from start to finish. The initial condition and required repair solution differ for every building.

How we renovate a balcony
Water can enter the structure through open joints and damaged junctions. Moisture may then build up in the structure and contribute to damp, mould and cold areas inside apartments. We address the cause rather than hide the symptoms: opening damaged areas, repairing concrete and reinforcement, sealing the junctions and protecting the balcony with a multi-layer system.

The deteriorated floor layer and old filler are removed back to sound concrete, opening the slab-to-façade junction for repair.

The blue cement-polymer passivating layer restores the reinforcement's alkaline protective environment and reduces the risk of further corrosion before the concrete is reinstated.

A continuous elastic polyurethane coating is applied over the mineral-broadcast substrate; the compatible finish forms the seamless protective surface and its final texture.
This typical sequence covers the balcony floor, slab edge and damaged concrete-façade details. Each chapter links to a representative frame in the scroll-controlled video; not every listed operation is shown separately. The exact scope, materials and control points are confirmed after a site inspection.
Renovation begins by opening the damaged layers and completely removing unsound material.
Weak and deteriorated cementitious material is mechanically removed until a sound load-bearing substrate is reached.
Old filler, contamination and unsound material are removed from the junction between the balcony slab and façade.
Loose rust and contamination are mechanically removed before the metal condition is assessed.
The exposed reinforcement and local details are assessed before reinstatement; unsound material, dust and visibly decayed supplementary timber are removed.
The reinforcement condition and remaining section are assessed. Any need for strengthening, replacement or welding repair is determined by a competent specialist after examining the structure.
The threshold, fixings and damaged metal or concrete details are cleaned and ground, loose particles are vacuumed away, and decayed supplementary timber is dismantled where present.
A cement-polymer passivating anticorrosion mortar compatible with the repair system restores the reinforcement's alkaline protective environment and reduces the risk of further moisture-driven corrosion. Railing fixings receive a separately specified solution according to metal type and condition.
Cracks, gaps and slab-to-façade junctions are prepared and sealed with an exterior elastic solution that accommodates normal structural movement.
Old filler, contamination and loose residue are removed so the sealant can adhere to sound, clean joint faces.
The prepared joint is filled with an elastic exterior sealant suitable for façade and floor junctions and resistant to cold, moisture and normal temperature-related movement.
An epoxy bonding adhesive connects the existing concrete to a system-compatible cement-based repair and drainage-fall layer that reinstates the substrate and directs water toward the outlet.
A two-component epoxy bonding adhesive is applied to clean, dust-free concrete to connect the existing structure with the fresh cement-based repair mortar.
A cement-based repair and drainage-fall mortar compatible with the selected system and suitable for exterior moisture and temperature changes is mixed according to its technical data sheet.
The mortar is placed and levelled toward the outer edge or drain to reduce standing water.
The cured repair and drainage-fall layer is primed, and a system-compatible mineral aggregate is broadcast into the fresh primer to create a bonding surface for the next layer.
Once the repair layer has cured and been prepared as specified, a two-component epoxy primer is applied.
A dry system-compatible mineral aggregate is broadcast into the fresh primer to create an even mechanical key for the elastic coating.
The epoxy primer, mineral broadcast, elastic polyurethane coating and decorative finish form one integrated coating system.
A continuous, seamless, elastic pigmented polyurethane coating is applied at the system-specified thickness over the prepared substrate.
A system-compatible decorative material is broadcast into the fresh polyurethane coating to create the balcony floor's texture and final appearance.
What housing associations ask
Clear answers before the inspection, proposal and work planning.
Yes. The specialist’s site visit and initial inspection are free of charge.
A complete renovation of one balcony typically takes seven working days. The overall schedule depends on the number of balconies, extent of damage, required curing intervals and weather.
Before work starts, we agree access arrangements and give the housing association clear instructions for emptying balconies and keeping the work zone safe.
Yes. Temperature, rain and required curing times affect the sequence of exterior work. We plan each stage so every layer is installed under the conditions specified for the system.
The correctly installed coating system has a designed service life of 10 years, providing long-term protection against moisture.
Where required, we also repair the slab edge, reinforcement, façade junctions and damaged concrete-façade details. The final scope is defined during the site inspection.
Let us discuss the project
Describe the building and visible damage. To prepare a proposal, we will clarify the scope and arrange a site inspection if required. The schedule depends on the extent of damage, technical curing intervals and weather.
A specialist’s site visit and initial inspection are free of charge.